Size:
10,000
Location:
Basingstoke
Activity:
Pharmaceutical & Healthcare
Duration:
12 weeks
Overview
Work included the fit out of a café, a front of house area with a flexible training suite, a break out area to be used for town halls and informal meetings, secondary air conditioning, new flooring, additional power and data, the installation of storage and the fitting of desks, booths and benches. Agile areas supported one to one desking while also providing alternative ways of working with high back benches and high level work benches.
Project completion
The design had to fit with global corporate standards and so good communication was key to ensure that these standards were met and to reassure the client throughout the process. Although Steris was specific about certain colours, the break out area was off brand and the client was delighted with the result.
“We had worked with Steris at a consultancy level for some time but this was our first fit out and our over-riding concern was to get it right given that it was a major step for the client to outsource this project. As timing was so important, we made sure that our updates were frequent and regular. Transparency was critical as we were working in unprecedented times at the height of lockdown.”
Project director, Office Principles